Umweltinstitut 2008
Bregenz | Austria

Task: complete refurbishment of the Institutes for Umwelt und Lebensmittelsicherheit
Client: Land Vorarlberg
Tender: Competition 1st prize

Architecture: Bernardo Bader Architects | Dornbirn
Team: Thomas Getzner (PL), Philipp Bechter | Dornbirn
Site manager: Fritz Feuerstein | Dornbirn
Structural engineer: Mader & Flatz Ziviltechniker GmbH | Bregenz
Photo: Bernardo Bader Architekten | Dornbirn
Floor space: 2.894,87 m²
Structure: Existing building